Digital Equipment Corporation RAID Array 3000 storage subsystem Installation Guide Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
RAID Array 3000 Pedestal Enclosure
1–2 EK–SM3KC–IG. A01
Figure 1–1 Second Controller Pedestal Slot Location
3
0
0
0
-4
8
Second
Contro ller
Slot
2.0 Installation Procedure
CAUTION
To prevent an electrical discharge from damaging
the SIMMs, always wear an ESD wrist strap con-
nected to a suitable ground when handling the
memory modules.
1. Ensure that the UltraSCSI bus is in a quiescent state (no I/O activity).
2. Shut down the host system.
3. Issue a “shutdown” command from the SWCC console to the pedestal con-
troller.
4. Power off the pedestal(s) and the UPS.
5. Perform an inventory of the items contained in the second controller kit op-
tion. The kit should contain the following:
RAID Array 3000 controller
3 SIMMs
Model label
Warranty Card
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments